4 IUP Grad Students will be out in Ward 2 conducting a sidewalk assessment throughout September and October.
The work will be conducted mostly in the evenings and entails mapping and tracking sidewalk imperfections.
Similar work was completed back in 2020 for the 1st Ward. The 1st Ward Sidewalk Assessment is available in our Document Center at the link below:
Comments